Radio System Execution

BRS Electrical were engaged by BMA to carry out electrical engineering support for Goonyella Riverside Mine (GRM) and Broadmeadow Mine (BRM) Digital Radio System Project. The Digital Radio System implements a standardised digital radio system to improve safety and operational performance. The project involved transitioning existing analogue radio to a digital radio system, as well […]

Cunnamulla STP Upgrade

BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the Cunnamulla STP Upgrade Project. The existing STP was originally constructed in the 1930’s and upgraded in the 1970’s to double the plant’s capacity. A recent review identified the that many of the plant components had reached the end of their […]

Radio Tower Earthing

BRS was approached by RCS Telecommunications to provide RPEQ earthing designs for several radio tower and communications hut sites across Central Queensland. Soil resistivity tests were conducted across all sites using the 4 point Wenner test method. From these results, BRS were able to model the soil resistivity for each site in SKM’s GroundMat software […]

Graincorp Fuel Terminal

As part of Graincorps’ expansion of its’ bulk liquid facilities, BRS Electrical was contracted in conjunction with CommsPower to complete electrical design for a new tank farm and upgrades to an existing fuel terminal at Pinkenba. The system had to monitor tank levels, flow rates, requests for product and transfer product between the ship berth, […]

Heyford Pit Pumping

The mine site required stored mine affected water within the Heyford Pit to be transported to other locations on site to enable coal production from this pit. This project comprised of 4 LV pumping stations at various locations across the site to facilitate the creation of a water transfer network. BRS was responsible for electrical […]

Dam Valve Solar System

As part of the sites water management and with the wet season fast approaching, a series of automated valves were required to be installed around the dam gates and diversion channel. The valves are situated in a remote location with a solar and generator backed system to supply power to the infrastructure. BRS provided the […]